Construction Project

Title:Working platform of View Tower in the?Bauhinia?Park,?Changzhou--Construction Project

Description: The View Tower is located in the Bauhinia Park, Changzhou, shaped in ring, width in 89m, height in 80m, thickness in 7m. RS Octagonlock scaffolding system is used as working platform for this project.
RS Octagonlock scaffolding system is very stable. One set of scaffolding is 1.2*1.5m, not only functional bust also economical. Scaffolding is erected on the ground and lifted to the work platform to be connected with scaffolding in the two sides. Advantage of RS Octagonlock system: saving material and labor, time and cost.

MORE>>

Title:Ma’anshan Exhibition Center Stadium Working Platform--Construction Project

Description: Ma’anshan exhibition center stadium occupies building area 61218 square meters, with two layers and 26.4m high (the height of center line of the upper chord of eave ). The upper part of roof steel structure is used the space structure system from primary truss to secondary trusses. The maximum span of the primary truss is 54m, with maximum cantilever length 17m. Under roof structure is reinforced concrete frame shear wall system. Rapid scaffolding, with the stability of frame body and convenience of erection and removal, has won the praise from safety bureau, ower, supervision unit and project department.

MORE>>

Title:Nanjing Archives Shoring Projects--Construction Project

Description: Nanjing archives total land area of 6666㎡, the total construction area of 40796㎡, nine layers on the ground,two layer underground, archives of roof steel structure engineering elevation of 37.25 m, the eight steps up new three layers of steel beam, eight level is + 29.45 m.This project is very difficult and need to try to stay away from the scene construction areas outside the frame at the same time, the rest on the seven floor set-up, the floor is complex.
0.5m distance Rapid Scaffold with net can avoid falling objects,be more safety.

MORE>>

Title:Nanjing Lukou International Airport Shoring Projects--Construction Project

Description: Nanjing Lukou International Airport airfield channel project(F1-3 section),located in the south new terminals, about 796m long,consisted by double orifice box culvert u-shaped slot and general road.The max height is 9.8m. The second phase expansion project of thickness is 1100 mm.
Disk lock steel tubular scaffold (“rapid scaffold”)used in the project of civil structure construction process,which Solve the following two technical difficulties:
1.Thickness plate.1100mm is very thick ,the load reached 30 kn / ㎡,Rapid Scaffold used 0.9m*1.2m*1.5m shoring frame.
2.High height.This height needed High demands on the scaffold overall stability.
    Rapid Scaffold used less material than other scaffold,and improves the overall stability and bearing capacity , less labour.

MORE>>

Title:Nanjing YOV shoring frame--Construction Project

Description: It covers an area of about 140000㎡. A total construction area of 500000 square meters, from A, B, C building and basement, one floor underground, 9 floors on the ground,27 floors total.A total construction area of about 196000 square meters, the entire cast-in-place reinforced concrete shear wall structure.
Rapid Scaffold mainly undertake the main building of the adjacent two nest between pouring concrete shoring scaffolds. The shoring frame height is 31m,the upper concrete thickness is 500mm.According to the site situation,Rapid Scaffold used 1.2m ledger , 0.9m ledger ,and adjustable base jack, perfect solved the problems of the scene, effectively improve the time limit for a project schedule.

MORE>>

Title:Shoring scaffolding for Vanke department in Nanjing--Construction Project

Description: This project is located in the Southeast of Nanjing South Railway Station, the area is 250 thousand m2, it’s a large-scale residential and commercial land use. It’s invested by Vanke. This project has 3 buildings, all use new construction technology in the consideration of economic,safety,  high efficiency and environment protection.
This project uses Rapid Scaffolding, erection and disassembly are together to shorten the construction period.

MORE>>

Title:Shanghai MIXC Formwork Support--Construction Project

Description: The Huarun Shanghai MIXC occupies construction area around 530000 square meters, which includes the MIXC shopping center 240000 square meters, the grade A office cluster 140000 square meters, and high-end boutique hotels 30000 square meters.
The project is built by the China Construction Eighth Engineering Division. And the parking lot project in the railway transportation line 10 at Wuzhong road, has taken a special construction technology of large steel beam with super-span air cantilever, which makes it as one of difficulties in this project.
(Herein below called “Rapid Scaffolding”) Rapid Scaffolding, with high strength bearing and good stability, can be adjusted through upper and bottom base jack to meet accuracy requirements at construction site. It has chosen innovative construction technology and successfully resolved urgent problems of 30m high formwork, overweight steel structure, tight schedule, and supporting area at floor.

MORE>>

Title:Wuxi Tai Lake New City--Construction Project

Description:

Wuxi Tai Lake New City located in South of Wuxi, design resident population is 1 million.It will be a new city center of Wuxi.
This project use Rapid support technical, base on site condition, we use 2 x 2m separate support style, space between each supporting is 4m. On work layer, we used the Rapid connect components to connect two separate supporting and put steel plank, this can save the material and labor, make the construct effectively.

MORE>>

Title:Shoring scaffolding and formwork for National Exhibition and Convention Center (Shanghai)--Construction Project

Description:

With area of approximately 855,946.8 square meters. Rapid Scaffolding undertook the China Expo exhibition  formwork project (North Block) EPC Engineering (Second Section). C1 16m high hall area formwork sub-projects. C1 zone on the highest floor of 5 floors with a total building height of 32m, Tight schedule, the process is complicated , big load. Using rapid socket type disc Scaffold (referred to as "rapid scaffolding") template cage, the successful resolution of frame beam size 1800 × 2650mm, and a large cross large beam line load reaches 100kN / m support requirements; Meanwhile, in the erection of scaffolding then pumping a few specimens of the shelf. Lift the upper portion of the connection through the top beam scaffolding, construction passage formed to ease the shortage of public resources to the scene of road congestion.

MORE>>