亚洲ⅴ国产Ⅴ天堂a无码二区_欧美中文日韩一区二区色视频精品_中文在线观看三级国产_亚洲性69影院在线观看_久久中文网一区二区_色噜噜狠狠色综合免费视频_毛片a级毛片免费观看免下载_日本乱中文字幕系列下载_97综合精品欧美视频_婷婷五月六月综合缴情

Close

Tunnel Project

Title:Wuxi Subway Line 2 --Tunnel Project

Description: This project is the Wuxi East Station of Beijing-Shanghai High Speed Railway, 629.55m length, 20.50m width.
  Because the support scaffolding system need to bypass the position of piles ,columns and structural girders and some walls, so it’s difficult to design the formwork and scaffolding system. The base wall is 1.1m, external wall is 5.71m, internal wall is 5.11m, system need to meet the needs of built of base to wall, wall to roof, the wall is high, side pressure is big, and can’t use the lifting appliance when dismantle the formwork, so the whole process include the erect and dismantle is difficult.
This project use “Rapid” Scaffolding,use two Rapid technical to meet the need of erect and dismantle, to ensure the project time line. Otherwise, this project save lots of material and labor for customer.

MORE>>

Title:Wuxi Subway Line 2 --Tunnel Project

Description: This project is the Wuxi East Station of Beijing-Shanghai High Speed Railway, 629.55m length, 20.50m width.
  Because the support scaffolding system need to bypass the position of piles ,columns and structural girders and some walls, so it’s difficult to design the formwork and scaffolding system. The base wall is 1.1m, external wall is 5.71m, internal wall is 5.11m, system need to meet the needs of built of base to wall, wall to roof, the wall is high, side pressure is big, and can’t use the lifting appliance when dismantle the formwork, so the whole process include the erect and dismantle is difficult.
This project use “Rapid” Scaffolding,use two Rapid technical to meet the need of erect and dismantle, to ensure the project time line. Otherwise, this project save lots of material and labor for customer.

MORE>>

Title:Wuxi Subway Line 2 --Tunnel Project

Description: This project is the Wuxi East Station of Beijing-Shanghai High Speed Railway, 629.55m length, 20.50m width.
  Because the support scaffolding system need to bypass the position of piles ,columns and structural girders and some walls, so it’s difficult to design the formwork and scaffolding system. The base wall is 1.1m, external wall is 5.71m, internal wall is 5.11m, system need to meet the needs of built of base to wall, wall to roof, the wall is high, side pressure is big, and can’t use the lifting appliance when dismantle the formwork, so the whole process include the erect and dismantle is difficult.
This project use “Rapid” Scaffolding,use two Rapid technical to meet the need of erect and dismantle, to ensure the project time line. Otherwise, this project save lots of material and labor for customer.

MORE>>

Title:Wuxi Subway Line 2 --Tunnel Project

Description: This project is the Wuxi East Station of Beijing-Shanghai High Speed Railway, 629.55m length, 20.50m width.
  Because the support scaffolding system need to bypass the position of piles ,columns and structural girders and some walls, so it’s difficult to design the formwork and scaffolding system. The base wall is 1.1m, external wall is 5.71m, internal wall is 5.11m, system need to meet the needs of built of base to wall, wall to roof, the wall is high, side pressure is big, and can’t use the lifting appliance when dismantle the formwork, so the whole process include the erect and dismantle is difficult.
This project use “Rapid” Scaffolding,use two Rapid technical to meet the need of erect and dismantle, to ensure the project time line. Otherwise, this project save lots of material and labor for customer.

MORE>>

Title:Wuxi Subway Line 2--Tunnel Project

Description: This project is the Wuxi East Station of Beijing-Shanghai High Speed Railway, 629.55m length, 20.50m width.
Because the support scaffolding system need to bypass the position of piles ,columns and structural girders and some walls, so it’s difficult to design the formwork and scaffolding system. The base wall is 1.1m, external wall is 5.71m, internal wall is 5.11m, system need to meet the needs of built of base to wall, wall to roof, the wall is high, side pressure is big, and can’t use the lifting appliance when dismantle the formwork, so the whole process include the erect and dismantle is difficult.
This project use “Rapid” Scaffolding,use two Rapid technical to meet the need of erect and dismantle, to ensure the project time line. Otherwise, this project save lots of material and labor for customer.

MORE>>

Title:Wuxi Subway Line 2--Tunnel Project

Description: This project is the Wuxi East Station of Beijing-Shanghai High Speed Railway, 629.55m length, 20.50m width.
  Because the support scaffolding system need to bypass the position of piles ,columns and structural girders and some walls, so it’s difficult to design the formwork and scaffolding system. The base wall is 1.1m, external wall is 5.71m, internal wall is 5.11m, system need to meet the needs of built of base to wall, wall to roof, the wall is high, side pressure is big, and can’t use the lifting appliance when dismantle the formwork, so the whole process include the erect and dismantle is difficult.
This project use “Rapid” Scaffolding,use two Rapid technical to meet the need of erect and dismantle, to ensure the project time line. Otherwise, this project save lots of material and labor for customer.

MORE>>

Title:Wuxi Subway Line 2--Tunnel Project

Description: This project is the Wuxi East Station of Beijing-Shanghai High Speed Railway, 629.55m length, 20.50m width.
  Because the support scaffolding system need to bypass the position of piles ,columns and structural girders and some walls, so it’s difficult to design the formwork and scaffolding system. The base wall is 1.1m, external wall is 5.71m, internal wall is 5.11m, system need to meet the needs of built of base to wall, wall to roof, the wall is high, side pressure is big, and can’t use the lifting appliance when dismantle the formwork, so the whole process include the erect and dismantle is difficult.
This project use “Rapid” Scaffolding,use two Rapid technical to meet the need of erect and dismantle, to ensure the project time line. Otherwise, this project save lots of material and labor for customer.

MORE>>

Title:Wuxi Subway Line 2--Tunnel Project

Description: This project is the Wuxi East Station of Beijing-Shanghai High Speed Railway, 629.55m length, 20.50m width.
  Because the support scaffolding system need to bypass the position of piles ,columns and structural girders and some walls, so it’s difficult to design the formwork and scaffolding system. The base wall is 1.1m, external wall is 5.71m, internal wall is 5.11m, system need to meet the needs of built of base to wall, wall to roof, the wall is high, side pressure is big, and can’t use the lifting appliance when dismantle the formwork, so the whole process include the erect and dismantle is difficult.
This project use “Rapid” Scaffolding,use two Rapid technical to meet the need of erect and dismantle, to ensure the project time line. Otherwise, this project save lots of material and labor for customer.

MORE>>

Title:Wuxi Subway Line 2--Tunnel Project

Description: This project is the Wuxi East Station of Beijing-Shanghai High Speed Railway, 629.55m length, 20.50m width.
  Because the support scaffolding system need to bypass the position of piles ,columns and structural girders and some walls, so it’s difficult to design the formwork and scaffolding system. The base wall is 1.1m, external wall is 5.71m, internal wall is 5.11m, system need to meet the needs of built of base to wall, wall to roof, the wall is high, side pressure is big, and can’t use the lifting appliance when dismantle the formwork, so the whole process include the erect and dismantle is difficult.
This project use “Rapid” Scaffolding,use two Rapid technical to meet the need of erect and dismantle, to ensure the project time line. Otherwise, this project save lots of material and labor for customer.

MORE>>