Formwork Shoring Project

Title:Shoring scaffolding for Vanke department in Nanjing--?Residential formwork support

Description: This project is located in the Southeast of Nanjing South Railway Station, the area is 250 thousand m2, it’s a large-scale residential and commercial land use. It’s invested by Vanke. This project has 3 buildings, all use new construction technology in the consideration of economic,safety,  high efficiency and environment protection.
This project uses Rapid Scaffolding, erection and disassembly are together to shorten the construction period.

MORE>>

Title:Shoring scaffolding for highway in Suzhou--Bridge formwork support engineering

Description: The highway width is 26-40m, the ramp width is 7.5-8.5m, abutment height is 10-15m.  Ramp E7, W6, W7,W8,W9 use Rapid Scaffolding.
All support scaffolding use Rapid Scaffolding, the erection height is 26-40m. It meets the high precision requirement by adjustable base jack and U-head.

MORE>>

Title:Wuxi East Station Platform Formwork Supporting Frame--Bridge formwork support engineering

Description: This project is located on Beijing Shanghai high speed railway and it is underground island type station. The total station length is 629.55m and width is 20.500m.

MORE>>

Title:Anhui Xuancheng Cast-in-beam Formwork Supporting Frame--Bridge formwork support engineering

Description: Anhui Xuancheng Cast-in-beam Formwork Supporting Frame, each section is treated as one joint and each joint has three span; the beam average height is 11.5m
    According to onsite beam size, time and loading requirement, the rapid scaffolding has reduced the labor cost and construction time.

MORE>>

Title:Shoring system and formwork of Hong Kong- Zhuhai-Macau Bridge--Formwork supporting project of rail transit

Description:  The Hong Kong-Zhuhai -Macau Bridge is an ongoing construction project which consists of a series of bridges, tunnels and artificial islands that will connect Hong Kong, Macau and Zhuhai.
    Our designed system scaffolding and formwork are honored to be used on one of the main islands - West Artificial Island for the shoring system of roof slab and wall panel in the buried section, with the advantage of erection and dismantling easily and high safety factor etc. Obtained the high praise from customers.

MORE>>

Title:Nanjing Lukou International Airport Shoring Projects--Formwork supporting project of rail transit

Description: Nanjing Lukou International Airport airfield channel project(F1-3 section),located in the south new terminals, about 796m long,consisted by double orifice box culvert u-shaped slot and general road.The max height is 9.8m. The second phase expansion project of thickness is 1100 mm.
Disk lock steel tubular scaffold (“rapid scaffold”)used in the project of civil structure construction process,which Solve the following two technical difficulties:
1.Thickness plate.1100mm is very thick ,the load reached 30 kn / ㎡,Rapid Scaffold used 0.9m*1.2m*1.5m shoring frame.
2.High height.This height needed High demands on the scaffold overall stability.
    Rapid Scaffold used less material than other scaffold,and improves the overall stability and bearing capacity , less labour.

MORE>>

Title:Shoring Formwork for Nanjing Metro--Formwork supporting project of rail transit

Description: Nanjing subway station is designed as 2-bay and 2-storey underground island platform station. The headroom of basement two is 6.28m, and basement one is 4.85m. The main structure of the station is constructed by using open cut method, and 2-bay and 2-storey underground box structure. The dimension of main components: roof thickness 800mm, top girder 800×1800 mm、900×1700(1800)mm、1000×1800 mm, plate thickness 400mm, longitudinal beam 900*800mm.
During the main structure construction process, all formwork support adopt Rapid disk lock steel tubular scaffold (herein below called “Rapid scaffolding”), which overcomed questions, like the plate is too thick, the size of beam section is too big, and so on.

MORE>>

Title:Shoring Projects in Wuhu Railway Station Anhui Province--Formwork supporting project of rail transit

Description: Wuhu Railway Station, with an area of 50,000 m2, is the largest station on the line of Nanjing to Anqing Inter-city Railway within Anhui Province.
In this project, Rapid Scaffolding was honored to supply its system scaffolding as shoring, under the large beam of 2.2x2.4m, using 0.9x0.9m shoring tower with ledger distance of 1.5m, and under the slab, using 1.2x1.5m shoring tower with ledger distance of 1.5m too, which saving a lot of material and labor, and abtained the highly commended by customers.

MORE>>

Title:Shoring scaffolding and formwork for National Exhibition and Convention Center (Shanghai)--Public building formwork support

Description: With area of approximately 855,946.8 square meters. Rapid Scaffolding undertook the China Expo exhibition  formwork project (North Block) EPC Engineering (Second Section). C1 16m high hall area formwork sub-projects. C1 zone on the highest floor of 5 floors with a total building height of 32m, Tight schedule, the process is complicated , big load. Using rapid socket type disc Scaffold (referred to as "rapid scaffolding") template cage, the successful resolution of frame beam size 1800 × 2650mm, and a large cross large beam line load reaches 100kN / m support requirements; Meanwhile, in the erection of scaffolding then pumping a few specimens of the shelf. Lift the upper portion of the connection through the top beam scaffolding, construction passage formed to ease the shortage of public resources to the scene of road congestion.

MORE>>

Title:Shanghai MIXC Formwork Support--Public building formwork support

Description: The Huarun Shanghai MIXC occupies construction area around 530000 square meters, which includes the MIXC shopping center 240000 square meters, the grade A office cluster 140000 square meters, and high-end boutique hotels 30000 square meters.
The project is built by the China Construction Eighth Engineering Division. And the parking lot project in the railway transportation line 10 at Wuzhong road, has taken a special construction technology of large steel beam with super-span air cantilever, which makes it as one of difficulties in this project.
(Herein below called “Rapid Scaffolding”) Rapid Scaffolding, with high strength bearing and good stability, can be adjusted through upper and bottom base jack to meet accuracy requirements at construction site. It has chosen innovative construction technology and successfully resolved urgent problems of 30m high formwork, overweight steel structure, tight schedule, and supporting area at floor.

MORE>>

Title:Nanjing YOV shoring frame--Public building formwork support

Description: It covers an area of about 140000㎡. A total construction area of 500000 square meters, from A, B, C building and basement, one floor underground, 9 floors on the ground,27 floors total.A total construction area of about 196000 square meters, the entire cast-in-place reinforced concrete shear wall structure.
Rapid Scaffold mainly undertake the main building of the adjacent two nest between pouring concrete shoring scaffolds. The shoring frame height is 31m,the upper concrete thickness is 500mm.According to the site situation,Rapid Scaffold used 1.2m ledger , 0.9m ledger ,and adjustable base jack, perfect solved the problems of the scene, effectively improve the time limit for a project schedule.

MORE>>

Title:Nanjing Archives Shoring Projects--Public building formwork support

Description: Nanjing archives total land area of 6666㎡, the total construction area of 40796㎡, nine layers on the ground,two layer underground, archives of roof steel structure engineering elevation of 37.25 m, the eight steps up new three layers of steel beam, eight level is + 29.45 m.This project is very difficult and need to try to stay away from the scene construction areas outside the frame at the same time, the rest on the seven floor set-up, the floor is complex.
0.5m distance Rapid Scaffold with net can avoid falling objects,be more safety.

MORE>>

Title:Liyang Hydropower Key Project Formwork Support--Public building formwork support

Description: Liyang hydropower key project is composed of four parts, which are the upper reservoir, the lower reservoir, the water conveyance system and the power plant system. The capacity of power station is 1500000 kilowatts. It transfers 500KV voltage to Jiangsu power grid. It’s annual power generation capacity is designed for 2007000000 kwh, and annual water pumping capacity is 2676000000 kwh.
The formwork support in this project’s upper reservoir and lower reservoir, takes Rapid disk lock steel tubular scaffold system (herein below called “Rapid scaffolding”), using different supporting ways in different areas.
1.In support of large curvature vertebral body structure, it’s difficult for frame body to find a supporting point, then it needs to be mounted at lower steel structure platform, with small unit 0.9*0.9m and step 1.5m.
2.Corbel’s maximum thickness of concrete reaches to 5m, and the narrowest part reaches to 3.4m. The frame body takes small unit 0.9*0.9m with step 1.5m.
     In the upper part of building structure, the top plate supporting height is 48m. The frame body has chosen A type standards (?60.3*3.2mm) 0.9*0.9m, with step 1.5m and one side fully mounted by diagonal braces.
      In this special formwork supporting project, Rapid scaffolding shows not only the excellent high bearing capacity, high safety, but also the greatly labor cost saving and construction period shorting.

MORE>>

Title:Tableform in Singapore--Plant formwork support

Description: One of the projects in Singapore was with an hight of 13m, slab thickness of 400mm and column cap hight of 800mm, and Rapid Scaffolding was applied for the tableform shoring, which only needs to erect the scaffold 1 time, and lifted to upper floor when the lower floor finished, so in this way it could be used repeatly, and could save a lot of lobar, time and place to store the material, then save impressive cost.

MORE>>

Title:Shoring Projects in Xishan Scientific Innovation Center--Office building formwork support

Description: Located in the key area of the Xishan New City, with an area of 93,400 m2, Rapid Scaffolding was used as the shoring in the secondary hall with an hight of 11.7.

MORE>>